To be removed: Construction debris Frequency: Once
Project Description
REMOVAL OF CONSTRUCTION DEBRIS. APPROX. 95% WOOD (SHED)
PIC INCLUDED. MAY BE ABLE TO FIT IN 1 TON IF PACKED RIGHT. MAY
WANT TO LOOK AT JOB 1ST. WOULD LIKE REMOVED AS SOON AS POSSIBLE.